API RP 92S – Managed Pressure Drilling Operations – Surface Back-pressure with a Subsea Blowout Preventer First Edition Includes Addendum 1 (2023)
This document provides information for planning installation testing and operation of wells drilled with surface back-pressure (SBP) managed pressure drilling (MPD). This document applies only to drilling rigs with subsea blowout preventers (BOPs).
This document considers situations where the total drilling operation is performed balanced or overbalanced including both hydrostatically overbalanced (no supplemental surface pressure needed to control inflow) and hydrostatically underbalanced (supplemental surface pressure needed to control inflow) systems.
Product Details
- Edition:
- 1st
- Published:
- 09/01/2018
- Number of Pages:
- 83
- File Size:
- 1 file 2 MB
- Product Code(s):
- G92S01 G92S01 G92S01
- Note:
- This product is unavailable in Russia Cuba Syria North Korea Ukraine Belarus Iran